Van Khieu

Plant Layout with Practical Method and
Systematic Planning

PLANT LAYOUT FACTORS

To execute a plant layout project in a sound, effective and systematic way, it is necessary to have the technical knowledge, the practical trade techniques and the preparation procedure. The principal factors to be considered are:

    • Analysis of the existing layout, the space utilization including plant facilities installations
    • Analysis of the products, the components and the materials
    • Operations procedure and sequence analysis
    • Working methods analysis
    • Flow of materials analysis
    • Machines and equipments utilization analysis
    • Materials handling system analysis
    • Plant facilities analysis
    • Maintenance system analysis
    • Production planning and control system analysis
    • Inventory control system analysis
    • Environment control system analysis
    • Employees services analysis
    • Analysis and determinaton of space requirements related to:
      • All operations
      • All equipment installations
      • Materials handling system
      • Warehousing and storage system for Raw materials, Work in process and Finished Goods
      • Employees services requirements
      • Environmental requirements
      • Building characteristics
      • Determination of improvements and changes required to obtain defined objectives.

 

[ Home | Profile | Clients | Résumé | Models | Contact | Français ]

 

Website by:
BlankFactory Design Inc.

www.blankfactory.com